Dingo Gear Gripper Long Lead without Handle is made of rubberized material with steel hardware which is ideal for large and strong animals. The lead is 20mm wide and 5 meters long. It is made by hand with great care, because we know how important its durability is during dog training. Dingo Gear Gripper Long Lead without Handle is hand made in Poland by Dingo Gear.
A 5 m long, 20 mm wide lead in rubberized material with steel hardware, designed for large and strong dogs. The rubberized material gives the handler a secure grip. Sold without a handle. Handmade in Poland by Dingo Gear.
Product Specifications
Specification
Details
Brand
Dingo Gear
Product type
Long training lead
Length
5 m
Width
20 mm
Material
Rubberized material (provides the grip)
Hardware
Steel
Handle
None (sold without a fixed handle)
Made in
Poland
Who it is for and how it is used
For experienced handlers who need extra lead length with large or strong dogs. Attach it securely to a suitable collar or harness attachment point. Typical uses: recall training, distance work and long-line handling.
Comparison: Dingo Gear leads at a glance
Product
Length
Width
Material
Hardware
Dingo Gear Leather Lead
1.8 m
1.8 cm
Waxed leather
Brass clips
Dingo Gear Gripper Long Lead without Handle
5 m
20 mm
Rubberized material
Steel
Frequently Asked Questions
Does it have a handle?
No. This model is sold without a fixed handle. The grip comes from the rubberized material
Von Ultimate Trainer’s Note
I consider this a must-have type of long lead for strong working dogs. It is very strong, and the rubberised material gives the handler very good grip.
Why Buy From Von Ultimate Dog Shop?
Von Ultimate Dog Shop is the Australasian importer of Dingo Gear leads and working-dog equipment.
Von Ultimate Dog Shop Is Known For Giving Back To The K9 Community